MI News NetworkNovember 14, 2025Shipping News
Drydocks
World has completed the full conversion and integration of the EMEM Floating
Production Storage and Offloading (FPSO) vessel, delivering an important
offshore asset that will support oil production at Nigeria’s Okwok field.
The vessel
sailed away from Drydocks World’s Dubai facility after a ceremony held on 8
November, marking the end of an extensive engineering project commissioned by
World Carrier Corporation on behalf of Oriental Energy Resources Limited.
Drydocks
World, a DP World company, carried out a complete refurbishment and conversion
of the former oil tanker. The project included significant structural
modifications, extensive marine system upgrades, and the installation and
integration of 19 topside production and utility modules.
These
upgrades transformed the vessel into a fully operational offshore production
unit designed for long-term deployment.
Captain
Rado Antolovic, CEO of Drydocks World, said that the company has completed more
than 50 major vessel refurbishment and conversion projects, including over 30
FPSO units.
The EMEM
FPSO has been built to support production at Nigeria’s Okwok oil field under
Petroleum Mining Lease 15. Once operational, it will be able to process up to
70,000 barrels of total liquids per day, manage about 15 million standard cubic
feet of gas daily, and store up to one million barrels of crude oil.
The unit is
designed to operate continuously for up to 15 years without drydocking and is
expected to begin production in the first quarter of 2026.
The vessel
was officially named in December 2024 during a ceremony attended by Nigeria’s
Vice President, Senator Kashim Shettima, along with senior government and
industry leaders.
Image Credits: NUPRC/Facebook
At the
sailaway ceremony, the Nigerian Upstream Petroleum Regulatory Commission
reaffirmed its support for President Bola Ahmed Tinubu’s Project 1 Million
Barrels Incremental Initiative.
The
Commission Chief Executive, Engr. Gbenga Komolafe, was represented by Executive
Commissioner for Development and Production, Enorense Amadasu. Komolafe said
that the initiative aims to lift Nigeria’s crude oil output through targeted
and impactful developments. He stated that the EMEM FPSO fits into this
national goal and demonstrates that Nigeria can achieve stable production and
export levels with strong regulation, technical input and industry commitment.
The
Commission also praised Oriental Energy Resources Limited for maintaining
safety standards and supporting growth through indigenous innovation.
According
to the regulator, the EMEM FPSO will process around 40,000 barrels of oil per
day and store up to one million barrels, helping to strengthen Nigeria’s
production capacity.
Reference: Drydocks World
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου